{"id":70255,"date":"2018-08-06T16:32:21","date_gmt":"2018-08-06T08:32:21","guid":{"rendered":"https:\/\/buletinonline.net\/v7\/?p=70255"},"modified":"2018-08-06T16:32:21","modified_gmt":"2018-08-06T08:32:21","slug":"ph-govt-says-lpts-third-phase-still-under-review","status":"publish","type":"post","link":"https:\/\/buletinonlines.net\/v7\/index.php\/ph-govt-says-lpts-third-phase-still-under-review\/","title":{"rendered":"PH Govt Says LPT&#8217;s Third Phase Still Under Review"},"content":{"rendered":"<p>The phase three of the East Coast Highway (LPT) linking Kampung Gemuruh near Kuala Terengganu to Pengkalan Kubur in Kelantan is still under review, Pakatan Harapan&#8217;s Deputy Works Minister Mohd Anuar Mohd Tahir said today.<\/p>\n<p>He said this was due to the current financial situation facing the government.<\/p>\n<p>\u201cEven though we have conducted a study on the highway and consultants have given their input, we still need to see whether or not the government has the financial capabilities to afford it and on the federal government\u2019s decision.<\/p>\n<p>\u201cThe previous Barisan Nasional (BN) government looked like they have postponed the project and focussed on other areas even though the government completed the study on the third phase of LPT in 2009.<\/p>\n<p>\u201cThe new government has decided to review BN\u2019s decision on the highway but it\u2019s not easy. We don\u2019t have Aladdin\u2019s lamp and the Works Ministry cannot make decisions on its own but must obtain input at the federal level, especially the Finance Ministry,\u201d Mohd Anuar said.<\/p>\n<p>The deputy minister was replying to a question posed by Tumpat lawmaker Che Abdullah Mat Nawi (PAS) who criticised the government for delaying the project despite the needs of those living in the East Coast.<\/p>\n<p>Che Abdullah pointed out that LPT phase three is a part of the 11th Malaysia Plan and the project should have been completed, to which Mohd Anuar rebutted saying that the blame should fall on the previous BN government for not completing the highway.<\/p>\n<p>On a related note Kubang Kerian MP Ahmad Baihaki Atiqullah (PAS) pointed out that festive season traffic congestions was due to three tolls found on the East Coast Highway and the highways leading to it.<\/p>\n<p>\u201cDoes the government have any plans to discontinue the tolls which are the cause of the massive traffic jams during festive seasons? The tolls located at Bentong, Karak and<\/p>\n<p>Gombak is the cause for the massive traffic jams,\u201d said Ahmad Baihaki.<\/p>\n<p>Mohd Anuar said the toll abolishment process takes time and it will be implemented when the time is right.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The phase three of the East Coast Highway (LPT) linking Kampung Gemuruh near Kuala Terengganu to Pengkalan Kubur in Kelantan is still under review, Pakatan Harapan&#8217;s Deputy Works Minister Mohd Anuar Mohd Tahir said today. He said this was due to the current financial situation facing the government. \u201cEven though we have conducted a study [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":70256,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"better_featured_image":{"id":70256,"alt_text":"","caption":"Phase two of the East Coast Highway (LPT) ended at Kampung Gemuruh near Kuala Terengganu","description":"","media_type":"image","media_details":{"width":1040,"height":501,"file":"2018\/08\/Screenshot-303.png","filesize":808199,"sizes":{},"image_meta":{"aperture":"0","credit":"","camera":"","caption":"","created_timestamp":"0","copyright":"","focal_length":"0","iso":"0","shutter_speed":"0","title":"","orientation":"0","keywords":[]}},"post":70255,"source_url":"https:\/\/buletinonlines.net\/v7\/wp-content\/uploads\/2018\/08\/Screenshot-303.png"},"_links":{"self":[{"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/posts\/70255"}],"collection":[{"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/comments?post=70255"}],"version-history":[{"count":1,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/posts\/70255\/revisions"}],"predecessor-version":[{"id":70257,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/posts\/70255\/revisions\/70257"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/media\/70256"}],"wp:attachment":[{"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/media?parent=70255"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/categories?post=70255"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/tags?post=70255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}