{"id":2084,"date":"2010-03-12T02:35:32","date_gmt":"2010-03-11T18:35:32","guid":{"rendered":"http:\/\/buletinonline.net\/v7\/index.php\/2010\/03\/senibahri-arkitek-denies-involvement-in-roofs-design\/"},"modified":"2010-03-12T02:35:32","modified_gmt":"2010-03-11T18:35:32","slug":"senibahri-arkitek-denies-involvement-in-roofs-design","status":"publish","type":"post","link":"https:\/\/buletinonlines.net\/v7\/index.php\/senibahri-arkitek-denies-involvement-in-roofs-design\/","title":{"rendered":"Senibahri Arkitek Denies Involvement In Roof&#8217;s Design"},"content":{"rendered":"<p><!--[if gte mso 9]><xml> <w:WordDocument> <w:View>Normal<\/w:View> <w:Zoom>0<\/w:Zoom> <w:PunctuationKerning \/> <w:ValidateAgainstSchemas \/> <w:SaveIfXMLInvalid>false<\/w:SaveIfXMLInvalid> <w:IgnoreMixedContent>false<\/w:IgnoreMixedContent> <w:AlwaysShowPlaceholderText>false<\/w:AlwaysShowPlaceholderText> <w:Compatibility> <w:BreakWrappedTables \/> <w:SnapToGridInCell \/> <w:WrapTextWithPunct \/> <w:UseAsianBreakRules \/> <w:DontGrowAutofit \/> <\/w:Compatibility> <w:BrowserLevel>MicrosoftInternetExplorer4<\/w:BrowserLevel> <\/w:WordDocument> <\/xml><![endif]--><!--[if gte mso 9]><xml> <w:LatentStyles DefLockedState=\"false\" LatentStyleCount=\"156\"> <\/w:LatentStyles> <\/xml><![endif]--> <!--[if gte mso 10]> <mce:style><!   \/* Style Definitions *\/  table.MsoNormalTable \t{mso-style-name:\"Table Normal\"; \tmso-tstyle-rowband-size:0; \tmso-tstyle-colband-size:0; \tmso-style-noshow:yes; \tmso-style-parent:\"\"; \tmso-padding-alt:0in 5.4pt 0in 5.4pt; \tmso-para-margin:0in; \tmso-para-margin-bottom:.0001pt; \tmso-pagination:widow-orphan; \tfont-size:10.0pt; \tfont-family:\"Times New Roman\"; \tmso-ansi-language:#0400; \tmso-fareast-language:#0400; \tmso-bidi-language:#0400;} --> <!--[endif]--><\/p>\n<p class=\"MsoNormal\"><span style=\"font-size: 10pt; font-family: Verdana;\">KUALA TERENGGANU, March 11 (Bernama) &#8212; Senibahri Arkitek, the consultancy firm appointed by the state government to design the space frame for Sultan Mizan Zainal Abidin Stadium has denied involvement in designing the roof.<\/p>\n<p> Architect Raja Kamarul Bahrin Shah said his company was only asked to design the building structure as the principal contractor had chosen a Korean company to design the roof which collapsed on June 2 last year.<\/p>\n<p> &#8220;We only acted as government consultant and were not directly involved in the structures&#8217;s detailed design and monitoring of the roof&#8217;s construction.<\/p>\n<p> &#8220;The roof was constructed by a consultant appointed by the principal contractor,&#8221; he told a press conference here on Thursday.<\/p>\n<p> Raja Kamarul was commenting a report on the stadium roof collapse announced by Menteri Besar Datuk Ahmad Said after chairing the State Exco meeting here yesterday.<\/p>\n<p> He said under the contract, the principal contractor, consultants and specialist contractors were involved in the roof&#8217;s detailed design.<\/p>\n<p> &#8220;They (consultants and specialist contractors) were appointed by the principal contractor to design, construct, supervise and build the roof&#8217;s space frame and related works.&#8221;<\/p>\n<p> Raja Kamarul who welcomed the report said he had explained the matter to the Board of Architects Malaysia (LAM) and the Malaysian Institute of Architects (PAM).<\/p>\n<p> He said Senibahri Arkitek had sent four letters to the Public Works Department (PWD) on the roof&#8217;s defects and would not be responsible if anything was to happen.<\/p>\n<p> &#8220;We believe that the collapse of the 2,500 tonne roof costing RM35 million will impact the stadium&#8217;s structure,&#8221; he added.<\/p>\n<p> &#8212; BERNAMA<\/span><\/p>\n<p>\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KUALA TERENGGANU, March 11 (Bernama) &#8212; Senibahri Arkitek, the consultancy firm appointed by the state government to design the space frame for Sultan Mizan Zainal Abidin Stadium has denied involvement in designing the roof. Architect Raja Kamarul Bahrin Shah said his company was only asked to design the building structure as the principal contractor had [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"better_featured_image":null,"_links":{"self":[{"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/posts\/2084"}],"collection":[{"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/comments?post=2084"}],"version-history":[{"count":0,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/posts\/2084\/revisions"}],"wp:attachment":[{"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/media?parent=2084"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/categories?post=2084"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buletinonlines.net\/v7\/index.php\/wp-json\/wp\/v2\/tags?post=2084"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}